Accomplished Projects
September 20, 2024
UE.22.address the issue of 3 main engines, Badouin, controller displays unable to read, found the display module are out of order.
Click to Zoom
September 19, 2024
TC Royal.MS cooperate with Anschütz representative completely the Gyro sphere replacement and configuration to meet the vessel DP operation, meet all customer requirements.
Click to Zoom
September 14, 2024
PTTEP.the Erawan generator engine overhaul job is on going.
Click to Zoom
September 7, 2024
Geo Sovereign.the urgent request to address pending issues on Geo Sovereign ie., the air strorage pumps, motors, power pack control system due to abnormal fucntions, welding jobs, etc., MS team is called onboard urgently to fix all pending problems within limited time before the vessel departure. All problem are fixed, completely.
Click to Zoom
August 30, 2024
AWB Rajawali.the motion monitoring system is installed on AWB Rajawali completely and ready to support helicopter operations.
Click to Zoom
August 22, 2024
The shipyard survey job.at Blue Oceanic Shipyard in Trang province, Kantrang, Thailand, to level up the Quality Management System (QMS) and so on. Great cooperation, team work & managements bring to success.
Click to Zoom
August 21, 2024
UE.14, The alignment job for Fire Fighting pump & Center Main Engine on UE.14 is completed. The sea trial is performed to check the equipment & vibration condition after job is done. All's good meet the vessel operations and requirements.
Click to Zoom
August 18, 2024
AWB Rajawali - Automated Weather Observing System (AWOS) equipment & installation is requried to support helicopter operations.MS is assigned to supply equipment, install and commisioining the system onboard in further.
Click to Zoom
August 17, 2024
PTTEP - PSB jetty, the front fenders fabrication job is completed and ready for installation.The addtional requried ganway and ladder is also completed, ready to deliver next week. All's good in time frame as planned.
Click to Zoom
August 15, 2024
TC Sapphire, Winch loadcell Tension pull test & Calibration has been done completely.Winch loadcell tension reading is calibrated and read accurately.
Click to Zoom
August 15, 2024
SC Galaxy: The loadcell of winch tension and calibraiton test has been done completely.This test is requried to ensure the tension reading is accurate for operation and safety reasons. All's done completely this afternoon.
Click to Zoom
August 14, 2024
SC Glory 3, We cooperate and work with Kobelt authorzied person to check.inspect and address the main engine control system on SC Glory 3, ensure all meet the client's request and requirements. Job is completed, tested and the vessel is ready to go offshore.
Click to Zoom
August 8, 2024
TC Neptune.We supplied provision to TC Neptune yesterday for full package & ensure able to support crew & passenger for the whole month while workign offshore.
Click to Zoom
August 5, 2024
SC Glory 7, The flow meters calibration is one of our highligts nowsdays.We have done for serveral vessels either Transfer flow meter or Coriolis flow meter. Just completed the flow meter calibraiton for SC Glory 7 recently.
Click to Zoom
August 4, 2024
TC Mermaid, Besides the engineering, repairing and maintenance jobs.recently we are requested to supply full provision to the vessel to support full operations in the gulf of Thailand. Yesterday we supplied for TC Mermaid.
Click to Zoom
August 4, 2024
Shipment requires surveyor to attend for loading/securing of cargo on trailers at manufacturer before road transport, also loading on vessel at LCB.Road transport is planned properly & the surveyor is required all the transportation processes for this whole month of July.
Click to Zoom
August 1, 2024
SC Bongkot: The aligment jobs on Auxiliary engine, shaft generator and Fire Fighting pump is completed.The good performance vessel requires good alignment. Good alignment can find at MS.
Click to Zoom
July 28, 2024
M/V Evay: The Alarm Monitoring System is safety priority system on the vessel.We checked, troubleshooted and finally addressed the issue on M/V Evay successfully yesterday.
Click to Zoom
July 20, 2024
Tan Cang 89 - Encountered the main engine PLC control system problem.MS team provided full support by getting PLC module and shipped by air. Once arrive SKL, download, migrate and configure the program to match as engine design. Problem is fixed, vessel able to continue the offshore operations.
Click to Zoom
July 7, 2024
U.Adventure, the winch tension pull test is crucial for safety reasons.Therefore, perform the annual service and annual tension test is very important to make all parties ensure that they are working with the high reliable equipment.
Click to Zoom
July 6, 2024
UE.25, when there is a gearbox or engine replacement & for efficient and good conditions of rotating parts, alignment is needed.We completed the Port Main Engine alignment just now.
Click to Zoom
June 19, 2024
MV.Han Zhi, loading survey.The loading survey at Laemchabang for MV. Han Zhi is performed completely.
Click to Zoom