Accomplished Projects


 
February 17, 2024
Winch load cell pull test and calibration: Monarch 1 & Monarch 2.Monarch 1 & Monarch 2 - Winch load cell tension pull test and calibration in Sattahip, Chonburi, is completed and meet all vessel operations requirements.
Click to Zoom

 
February 11, 2024
The clutch in & clucth out remotely (from the bridge) problem : M.Emperor.The problem of the cluch in/ out remotely which chronic since day 1, MS team is called onboard to troubleshoot & rectify the problem. The clutch in & clucth out remotely (from the bridge) problem is successfully fixed. The operation is back to normal.
Click to Zoom

 
February 11, 2024
Calibrate load cell : TC Dragon.An annual winch load cell test & calibration on TC Dragon is completed. All readings (load & length reading) are accurate and in a good shape. This operation makes the vessel crew working safely and comfortably while performing the anchor or towing operation.
Click to Zoom

 
February 4, 2024
We will be second to none for the PLC & Control System Thrusters (Bow & Stern): U.Adventure.The thruster control system is one of the major control systems onboard which crucial and require the accurate reading. We already addressed the problem the vessel encountered. All's good on U.Adventure.
Click to Zoom

 
January 23, 2024
High speed crew boat. (Vessel Motion Monitoring System (VMMS): Express 101.การติดตั้งระบบ VMMS บนเรือความเร็วสูง เพื่อนำข้อมูลลิงค์ข้อมูลกับ Real Time Monitoring System เรียบร้อย ทดสอบระบบผ่านเรียบร้อย meet the customer requirements. : M.Emperor.
Click to Zoom

 
January 14, 2024
Real time flow meter installation and commissioning : M.Emperor.Another mile stone for the real time flow meter system installation and commissioning on M.Emperor. With the great cooperation from crew, ship owner and MS team, job is completed as per requirements and meet time line.
Click to Zoom

 
December 20, 2023
Winposh Regent.Gearbox parts recondition, installation & commissioning on Winposh Regent is completed. Good lesson learned on this jobs for new knowledge, people communications & connections, etc. "You don’t learn to walk by following rules. You learn by doing, and by falling over" - Richard Branson.
Click to Zoom

 
December 7, 2023
Kamala Thanee.Another mile stone for MS team to supply, install and perform the commisioning for the helicopter support equipment (including weather sensors and so on) to support helicopter on accomodation barge, Kamala Thanee, to meet CAP437.
Click to Zoom

 
November 18, 2023
The winch tension pull test for SC Nata. The winch tension pull test for SC Nata at Sattahip port is completed.
Click to Zoom

 
November 16, 2023
The motion sensor & equipment to support AWOS. Another big project is ongoing, the motion sensor & equipment to support AWOS (Automated Weather Observation System) for the accommodation barge. Parts & equipment we order just arrived MS shop yesterday.
Click to Zoom

 
November 15, 2023
Fire Fighting Pump. Another challenging problem, the 80% engine load limit is trigged, then cause the function of Fire Fighting Pump pump could not engage the pump and run as needed. We troubleshooted and finally found the cause from PLC input. Fixed the problem, engine is back to normal.
Click to Zoom

 
November 7, 2023
AAL Singapore : cargoes loading survey. Cargoes loading survey for AAL Singapore at Laemchabang port, Chonburi, Thailand, is on going. The cargoes loading & lashing is crucial. There are many factors to be considered, calculated to get the best solution for loading.
Click to Zoom

 
November 6, 2023
MV. Kou Lin : challenge welding job. One of the toughest welding jobs we encountered. Many unforeseen obstacles, however we made it. MV.Kuo Lin, Our new foreign customer found MS via internet, trust and reliable is most valuable. ฟ้าหลังฝน… ยังสวยงามเสมอ “Every cloud has a silver lining”
Click to Zoom

 
November 4, 2023
MV. Kou Lin : challenge welding job. Today we are having challenge welding job on cargoes containers vessel, MV. Kuo Lin. However, we will make it happen and exceed customer requirements.
Click to Zoom

 
November 3, 2023
Pacific Innovation : cargos loading survey. The cargo loading survey is started today, some of heavy lifts (above 100 tons each) will be done tomorrow.
Click to Zoom

 
October 27-29, 2023
Winches tension pull test on Mermaid Resiliant. MS team completed the winches tension pull test on Mermaid Resiliant, there are 8 winches onboard. However, with great cooperation and well prepared for tools and equipment, therefore, the job has done completely and safely.
Click to Zoom

 
October 28, 2023
Real Time Fuel Monitoring System on U.Advancer. The Real Time Fuel Monitoring System on U.Advancer is back to full service. All flow meter parameters consumption, engine and shaft speed is sent online and reports real time. - Oct 28, 2023.
Click to Zoom

 
October 27, 2023
Mermaid Resiliant winch tension pull test (8 winches). MS team left SKL this morning to onboard Mermaid Resiliant which required to perform the anchor winches pull test. Our team with calibrated load cell is ready to service & ensure the anchor winches are in a good condition.
Click to Zoom

 
October 8, 2023
Aos 8: Engines alignment jobs. Another challenging alignment jobs for the high speed vessel, Aos 8, alignment on CME, gearbox and FiFi pump. Completed successfully.
Click to Zoom

 
October 8, 2023
Alignment job and vibration survey for the Top Drive System (TDS). The alignment job and vibration survey for the Top Drive System (TDS) on the drilling rig which our team has been supporting the rig operation for weeks is success completely.
Click to Zoom

 
October 7, 2023
MV. Kuo Lin. The damage at the hull on MV. Kuo Lin berth at Bangkok port yesterday, our surveyor was called urgently to survey and investigate & address the damaged (with class surveyor) to let the vessel able to carry on the commercial activities in further (Oct 7, 2023).
Click to Zoom

 
October 2, 2023
Cargo loading survey by Sterling Technical Services (Thailand). The cargo loading survey by Sterling Technical Services (Thailand) has been done completely yesterday. All cargoes are inspected and loaded safely & ready for departure.
Click to Zoom

 
October 2, 2023
TC Dragon, CPP control system. TC Dragon, CPP control system problem which urgent called at PSB jetty. MS team onboard, troubleshoot and addressed the problem, respectively.
Click to Zoom

 
October 1, 2023
Alignment Top Drive. The Top Drive System (TDS) alignment jobs on the rig is existing continuously. Our team onboard the offshore rigs time to time to serve the alignment jobs as per customer requirements.
Click to Zoom

 
October 1, 2023
Express 101 Engine alignment. While one team is working on the rig, MS other team just completed the alignment job on Express 101. All’s completely performed as planned.
Click to Zoom

 
August 20, 2023
Cargoes loading survey on M.V. BBC CITRIEN at Laemchabang port, Chonburi province, Thailand (by Sterling Technical Services, Thailand).
Click to Zoom

 
September 1, 2023
Gypsies replacement on Hai Doung 102. The winch Gypsies installation job for Hai Doung 102 is done completely as planned. The vessel port called at Siam Commercial Sea Port, Sriracha, Chonburi province, Thailand. Our team travelled from Songkhla to perform the jobs as per customer requirement completelyat Laemchabang port, Chonburi province, Thailand. MWS – Marine Warranty Survey is also full provided to our customers.
Click to Zoom

 
July 18-19, 2023
Cargoes loading survey, Sterling Technical by Marine Services. at Laemchabang port, Chonburi province, Thailand. MWS – Marine Warranty Survey is also full provided to our customers.
Click to Zoom

 
June 21, 2023
Shelf Drilling Offshore Rig. Our alignment team travels by helicopter to perform the laser alignment for generator and top drive on Shelf Drilling rig. All’s completed meet customer requirements.
Click to Zoom

 
June 21, 2023
U.Samui – Loadcell tension pull comparison & calibration test on U.Samui is completed for both AFT and FWD stations.
Click to Zoom

 
June 11, 2023
MS team completed the BOSIET (Basic Offshore Safety Induction and Emergency Training). ready to work and service offshore operations and requirements i.e. Mechanic, Electrical and Control System, etc. On this trip mechanics travel to  MV.Prowess for alignment and vibration survey jobs.
Click to Zoom

 
June 8, 2023
Fuel consumption monitoring – additional engine load function. The fuel consumption monitoring is advanced one more step by pulling engines load data to monitor record in systems. The advantage is that all engine usage condition is be monitored and controlled properly. Express 101 - High speed passenger crew boat with high quality and luxury, deserves good system onboard.
Click to Zoom

 
June 8, 2023
Mermaid Sapphire - Subsea crane. The job of subsea crane maintenance is going on. Team is working hard to complete the job & to meet the customer requirements.
Click to Zoom

 
May 7, 2023
U.Adventure: winch load cell calibration & comparison pull test.  Another winch load cell calibration & comparison pull test yesterday (May 7, 2023) on U.Adventure, completed as per the vessel operations requirements.
Click to Zoom

 

May 7, 2023
Winch calibration & tension comparison pull test on SC Galaxy. The winch tension pull test for SC Galaxy is completed as per requirements. The reason for this test is to ensure the winch readings are accurate and high reliable.
Click to Zoom

 

April 29, 2023
Join the navy to see the world, support Royal Thai Navy to survey the damages. out of order equipment at navy fleet. “ร่วมเครือนาวี จักยลปฐพีไพศาล” MS พร้อมร่วมสนับสนุน ให้ทุกระบบมีความพร้อมและสมบูรณ์ยิ่งขึ้น.
Click to Zoom

 

April 24, 2023
Hai Doung 05 Real time fuel monitoring system. MS installed the real time fuel monitoring system on HD-05, set up, configured, commissioned and followed by sea trial completed yesterday (Apr 24, 2023).
Click to Zoom

 

April 9, 2023
Gyro annual services on TC Hai An. The Gyro annual services for TC Hai An 3 units are completed done & meet all required as planned.
Click to Zoom

 

April 5, 2023
Alignment and  vibration is for crew boat, UE.19. Completely performed as planned for the job of alignment and vibration survey on crew boat UE.19 after replacing main engine and gearbox on Center Main Engine (CME) and Starboard Main Engine (SME), accordingly.
Click to Zoom

 

April 5, 2023
Tension pull test and calibration for the winches on TC Vigour. Tension pull test and calibration for the winches on TC Vigour is completely done on April 4, 2023. We conduct this job by competent team & reliable calibrated loadcell from USA.
Click to Zoom

 

Mar 31, 2023
Automated Weather Observation System & Motion sensor. The Automated Weather Observation System & Motion Sensor installation and commissioning on the vessel Nava Thanee is performed completely on Mar 31, 2023.
The full function is tested completely & successfully as planned.
Click to Zoom

 

Mar 27, 2023
Another alignment and vibration survey is performed completely after the center main engine is replaced.
Click to Zoom

 

Mar 22, 2023
The alignments is 2 days continuously in different areas. Mar 21 MS team works on SC Glory 5 (replace coupling for FiFi pump) at Sattahip port, Chonburi province then Mar 22 works on Uniexpress 22 (replace gearbox), respectively.
Click to Zoom

 

Mar 22, 2023
The Loadcell troubleshooting, calibration and PLC programming which has been a chronic problem for sometime is already fixed. All’s good and back to normal. - M.Vigilant
Click to Zoom

 

Mar 21, 2023
The satellite antenna dome and equipment removal is completely done safely. Ready to install on other vessels.
Click to Zoom

 

Mar 10, 2023
The flow meters installation & real time flow meter monitoring system commissioning is completed and meet the client (Chevron Thailand) requirements.
Click to Zoom

 

Mar 6, 2023
The sea trial for the RTFMS (Real Time Flow Meter System) was completed successfully on Hai Duong01 yesterday (Mar 6, 2023). All's going well as per requirements.
Click to Zoom

 

Mar 5, 2023
The alignment job on the main engine and Fire Fighting Pump (FiFi). To ensure all equipment installations are aligned to each other’s - SC Glory 2.
Click to Zoom

 

Mar 6, 2023
The job of real time flow meter installation & also installs the new system for fuel consumption, real time monitoring system on TC Royal which all are new for our team. But all’s good, successfully completed and meet all clients requirements.
Click to Zoom

 

Mar 4, 2023
The job of engine speed control (Kobelt) equipment installation which is urgently requested to address and get the system back to work immediately – Completed successfully and meet all time line. – SC Glory 2
Click to Zoom

 

Mar 4, 2023
Inmarsat-C of TC Vigour has a problem and urgent request to get MS technicians to onboard and address the problem. We found that the problem is RF Converter – job is completed as per requirements. – TC Vigour
Click to Zoom

 

Mar 4, 2023
The job of Real Time Flow Meter system installation & commissioning to meet the oil & gas and vessel owner company’s requitements. - HAI DUONG 01
Click to Zoom

 

Feb 21, 2023
The job of Gyro annual service (3 units) on TC Dragon. Encountered with challenged problems due to long last service. The Simrad gyro has a control board problem. Gyro sphere of STD-22 take time to settle. However, finally all problems are fixed. The vessel is back to operate offshore as normal.
Click to Zoom

 

Feb 21, 2023
The urgent need for brand new radar installation & commissioning on TC Hai An which has time room limit, we completed in time & meet all vessel operations requirements.
Click to Zoom

 

Feb 16, 2023
The HMI display monitors to show the fuel consumption is required additional install on the bridge. Therefore, the vessel have Engines HMI & Bridge HMI for the efficient operations & managements - Vos Challenge
Click to Zoom

 

Feb 12, 2023
The winch tension pull test & calibration is conducted at Sattahip port for 2 vessels in one trip. Crew & Client are confident that winch & equipment are still working in a good function & condition.
Click to Zoom

 

Feb 5, 2023
At Sattahip Navy Port, Chonburi ⛴️The job of Azimuth Thruster Damaged survey by Sterling Technical Services (Thailand) under MS which encountered the problem of control system. We found that the problem come from the power unit  is abnormal. Dig down and found the PM of power unit shall be strictly applied. Replace the power unit then get back the vessel Azimuth system back to work as normal.
Click to Zoom

 

Jan 29, 2023. (Kobelt)
Another long trip from Songkhla to Ranong province to address the problem of engine speed control system, Kobelt. All’s good as planned, ship is back to work offshore
Click to Zoom

 

Jan 4, 2023.
Alignment & Vibration survey (Kobelt control system), MS team is always here to find the solutions for you.
Click to Zoom

 

Dec 31, 2022. Real time flow meter
Last day of the year, MS team onboard to address the real time flow meter problem for supply boat, Vos Atlanta, successfully as per requirements.
Click to Zoom

 

Dec 16, 2022. Motion sensors and weather monitors systems installation and commissioning
The barges or rigs which have helicopter operations are required to have motion sensors and weather monitors systems. MS completed the motion sensor and weather monitoring system installation and commissioning for accommodation barge, Two Aaryan completely as per requirements.
Click to Zoom

 

Nov 4, 2022. The CPP control system
The CPP control system has a problem, couldn’t order as needed. MS team onboard then troubleshoot, found one of crucial spare part is out of order. MS import spare parts and addressed the issue accordingly. CPP (Controllable Pitch Propeller) MS team performed the RCA (Root Cause Analysis) and addressed CPP problems successfully on TC Lam Son
Click to Zoom

 

Oct 21, 2022 
The load reading for either work wire & tow wire for MT.Winposh Regent are completely calibrated on Oct 21, 2022.
Click to Zoom

 

Oct 21, 2022
The cargo pump control system which really need to address the abnormal urgently. The inverter control is required to get emergency start/ stop either on the bridge or main deck. MS team response all requests completed successfully, and the ship can go operation offshore as normal in time. – Winposh Regent
Click to Zoom

 

Oct 10, 2022 
Frequent urgent request jobs come to MS recently, this time the urgent request to supply, install and configure gyro compass to support DP (Dynamic Position) operations. -TC Tan Cang 89
Click to Zoom

 

Oct 05, 2022
MT.Winposh Regent has chronic FiFi problems for long time, finally MS team troubleshooted and addressed the issue completely.
Click to Zoom

 

Oct 01, 2022 
Urgent request to get 2 GPS systems onboard for TC Lam Son, MS arranged all required equipment, installed and commissioned the system completely. 
Click to Zoom

 

Oct 01, 2022
MS electricians perform the annual service for either ACB (Air Circuit Breaker) or MCCB (Molded Case Circuit Breakers) on the ships to ensure all those equipment are in good condition and good functions to meet ships operations.
Click to Zoom

 

Oct 01, 2022 
Another condition damaged survey we have performed on MT. Aljalaa by STS Thailand by MS.
Click to Zoom

 

Sep 24, 2022
Marine Services Co., Ltd. (MS) by Sterling Technical Services (Thailand) completed the loading stowage and lashing survey for the vessel Kifune from France yesterday.
Click to Zoom

 

Aug 26, 2022 
Either the towing and anchor winches require to perform the break test to ensure its work and functions and needed. MS performed the break testing for both FWD & AFT stations for MT. Sri Khirichad today.
Click to Zoom

 

Aug 24, 2022
Fuel monitoring system is crucial and require the accuracy and reliability. Therefore, MS got the order to upgrade the system to get higher reliability. Job is completed almost midnight last night (Aug 24, 2022). The system is online as per requirements – UE.11
Click to Zoom

 

Aug 24, 2022 
The gas detector stations are urgently required by clients. MS source for all required equipment as needed, installed and commissioned completely today. - TC Royal
Click to Zoom

 

Aug 22, 2022
TC Lam Son has a CPP control system problem, could not get the accurate degree as needed. MS team onboard survey and troubleshoot to find the cause of problem. Then the problem is fixed accordingly.
Click to Zoom

 

Aug 25, 2022 – UE.11, UWO.
Fuel monitoring system is crucial and require the accuracy and reliability. Therefore, MS got the order to upgrade the system to get higher reliability. Job is completed almost midnight last night . The system is online as per requirements.
Click to Zoom

 

Aug 24, 2022 – TC Royal, TCO.
The gas detector stations are urgently required by clients. MS source for all required equipment as needed, installed and commissioned completely today.
Click to Zoom

 

Aug 22, 2022 – TC Lam Son, TCO.
TC Lam Son has a CPP control system problem, could not get the accurate degree as needed. MS team onboard survey and troubleshoot to find the cause of problem. Then the problem is fixed accordingly.
Click to Zoom

 

Aug 19, 2022 – M.Ranger, Meo, at Tok Bali, Malaysia
Real Time Flow Meter System on Meo Ranger has problems for many months, once the ship is closest to Thailand, Tok Bali, Malaysia, then customer called MS team to fix problems . Long traveling but don’t make customer disappear. Problem is fixed.
Click to Zoom

 

Aug 23, 2022 –PSB jetty., PTTEP.
Fabricate and installation front fender 10 sets for PSB jetty. Fabrication & Installation job is completed as per client requirement.
Click to Zoom

 

Aug 6, 2022 – TC Dragon, TCO.
We are so proud to address the towing / work wire control system on TC Dragon which be informed that some contractors already gave up. We onboard, ask for the wiring diagram to troubleshoot and find the cause of problem. Then we addressed the problem completely, follow by the load test & calibration.
Click to Zoom

 

July 30, 2022 – MT.Sri Khirichad, Prima Marine.
The main engine pneumatic control problem on MT.Sri Khirichard had a problem, couldn’t increase speed on the bridge as needed. MS team onboard and fixed the problem successfully.
Click to Zoom

 

July 24, 2022 – UE.19, UWO.
The current main engines display monitors are out of order, malfunction and couldn't response the ship operation, MS is assigned to source the new display monitor set and configure to get all required parameters as per vessel requirements.
Click to Zoom

 

July 23, 2022 – U.Chumporn, UWO.
Towing winch break test is performed follow OCIMF guidelines completely last night for U.Chumporn at Sattahip port, Chonburi province.
Click to Zoom

 

July 3, 2022 – TMS Andman, TMS.
Another Cummins generator engine, 6BT5.9, overhaul job is on going. We dismantle parts to inspect the condition and ensure each part functions. At the end, engine performance will tell the quality of our team's jobs.  Job completed and delivered back to the vessle on time completely.
 

 

June 27, 2022 – MV.Van Gogh
The lifeboat propeller and control system on MV.Van Gogh is fixed by MS team. We are challenging the get job qualities as always..... "If the problem is not fixed & satisfied, no charge !", finally we made it successfully and satisfied the customer.
Click to Zoom

 

June 18, 2022 – UE.19, UWO.
The fire alarm control system is one of critical equipment on the offshore ships. Once there is any fault or error in the system, required to address the problem as soon as possible. MS team fixed the fault alarm completely. 
 

 

June 18, 2022 – TMS 4, TMS.
The bow thruster joystick control system is designed by MS team, to meet the ship operation requirements, is completed successfully. – TMS 4
 

 

May 5, 2022 – SC Glory 7, SC Group. After SC Glory 7 replace the gear box and observe high vibrations, MS team is called to onboard to troubleshoot and rectify the problems. We found the gearbox and main engine misalignment is the cause then addressed the problem completely.
Click to Zoom

 

May 31, 2022 – U.Advanture, UWO. The flow meter installation and commissioning is completed for a supply boat.
Click to Zoom

 

26 Apr, 2022: M. Resolution - The chronic problem of bow thruster control system on supply boat is fixed by MS team last night.
Click to Zoom

 

13 Mar, 2022: M.Monarch 2 - Real Time Flow Meter Monitoring System installation &
commissioning is completed for another supply vessel.
Click to Zoom

 

30 Mar, 2022: MS team is performing the main engine overhaul job, not matter how big or
small, old or new engines, we will not make our customer down.
Click to Zoom

 

27 Mar, 2022: M.Endurance - Even though time is tough and limited, but MS has never let
the customer down. Real Time Flow meter System installation and commissioning, follow by
the ship sea trial is completed successfully yesterday for anyone.
Click to Zoom

 

24 Mar, 2022: The ACB (Air Circuit Breaker) is an important part for the auxiliary engines
synchronizing. We got the problem as informed that the ACB on CAE (Center Auxiliary
Engine) could not good synchronized with PAE ( Port Auxiliary Engine) & SAE (Starboard
Auxiliary Engine). MS electricians addressed the issue properly & completely.
Click to Zoom

 

21 Mar, 2022: U.Supporter - Safety is always priority, therefore the Alarm, Control &
Monitoring System is crucial and necessary for the supply boat. Once there is problems or
abnormal, MS team onboard to address, rectify and test all functions. All's back to work as
normal.
Click to Zoom

 

19 Mar, 2022: Marine Services Co., Ltd. is attending the Asia Pacific Marine (APM)
exhibition at Marina Bay, Singapore. Marine cooperations exhibition and one on one
meeting is the great experience and good collaboration among each company.
Click to Zoom

 

9 Mar, 2022: The real time flow meter monitoring system is installed and ready for the ship
for sea trial. The consumption will be monitored in your mobile then.
Click to Zoom

 

8 Mar, 2022: The bow thruster PLC control system which has chronic problems for a while,
is already fixed by MS team last night. Ready to go abroad.
Click to Zoom

 

1 Mar, 2022: Another watertight door PLC control problem is fixed. MS addressed the
problems, meet the vessel design requirements and satisfied crew completely.
Click to Zoom

 

26 Feb, 2022: Work silently, let the results speak loud. Real time flow meter system
installation and commissioning.
Click to Zoom

 

16 Feb, 2022: The shark jaw piston cylinder replacement job is completed in time. The
vessel goes for offshore operation as planned.
Click to Zoom

 

28 Dec, 2021: The heat exchanger which impacts the performance of engine highly. If the heat
exchanger is dirty then will cause the cooling water flowing. Therefore, recondition and cleaning
is needed.
Click to Zoom

 

16 Dec, 2021: The jobs of PLC control program mitigation of watertight door for 2 stations on
SC winter is completed. All's good.
Click to Zoom

 

12 Dec, 2021: The engines KTA38-M2 overhaul job is ongoing great as planned. We are
almost there at the target. However, next destination is still waiting for us.
Click to Zoom

 

2 Dec, 2021: The jobs of generators control system repairing and modifications for the
Rajamangala University of Technology Srivijaya is on going, the make the control system
similar the system in the offshore boats.
Click to Zoom

 

27 Nov, 2021: There are 2 Auxiliary engines, Cummins 6BT5.9, overhaul jobs on vessel
TMS 7 is done completely.
Click to Zoom

 

25 Nov, 2021: Water mist system ( a fire protection system ) has a control problem, MS
team onboard and addressed the issue completely at Noo island, SKL, Thailand.
Click to Zoom

 

5 Nov, 2011: The urgent request to address the Baudoin vessel main engines regarding fuel
water contaminated is completed today.
Click to Zoom

 

4 Nov, 2021: The slipway design & fabrication project at PSB jetty is completed.
Click to Zoom

 

9 Oct, 2021: The 6th vessel, last one for the bow thruster system installation in this round.
We have completed for 5 vessels already, so, our team work automatically for each job
step.
Click to Zoom

 

8 Oct, 2021: Another big challenging job for MS team, repairing the Fire Fighting pump
(FiFi). Reba this vessel has not been serviced for years, there many parts are missing and
deteriorated. MS team has been working hard to make it happen.
Click to Zoom

 

4 Oct, 2021: The 5th vessel is completed for the job of bow thruster installation and
commissioning, proved by the sea trial today. All functions meet all customer requirements.
Click to Zoom

 

26 Apr, 2021: The couple alignment jobs for bow thruster & Fire Fighting are calling, those
parts are critical and highly impact for the equipment performance.
Click to Zoom

 

25 Sep, 2021 The 5th vessel, UE.13, for us to perform the bow thruster installation and commissioning. "Just do it" is the really key success for team to improve and moving forward to bright future. It’s low hanging fruit for the job of bow thruster installation and commissioning right now.
Click to Zoom

 

5 Sep, 2021 More than the business, it's the prides of our team. Even on Sunday, but MS team also provided the best effort to service urgent unwanted engines abnormal condition for our client's vessel. All's good, crew boat is heading back for offshore operation.
Click to Zoom

 

1 Sep, 2021 The 4th vessel for the Bow thruster installation & commissioning has started today. It's seem like things more easier than before. We are the SME (Subject Matter Expert) now.
Click to Zoom

 

21 Aug, 2021 The vessel TMS 10 is urgent called back to port due to the heat exchanger is leaking then required to replace, MS team immeadiately onboard to support & fix the abnormal conditions. Then the the vessel is back to required condition and back to work on time. Another pride of our team.
Click to Zoom

 

18 Aug, 2021 Another MS team started working on the front fenders replacement at PSB jetty. The old poor condition sets are removed/ replacing the brand new ones, 17 sets for this MS project.
Click to Zoom

 

15 Aug, 2021 The 3rd vessel, UE.,  is on dry dock & today is ready for MS team to perform to repeated jobs, install bow thruster tunnel.
Click to Zoom

 

3 Aug, 2021 MS team is having big overhaul jobs on Baudoin engines & FiFi pump overhaul. Yes, we do "Plan our work, then work our plan" for SC Glory 6.
Click to Zoom

 

2 Aug, 2021 The hull plate welding which is required special preparations & welding procedures, we also have qualified welders for these kind of jobs for UE.12.
Click to Zoom

 

27 July, 2021 The 2nd vessel, UE.12, is on dry dock ready for next bow thruster installation & commissioning, MS team is also ready to work immediately.
Click to Zoom

 

25 July, 2021 Auxiliary engines synchronized is one of problems that many vessels encountered. To support vessel operations e.g, swapping auxiliary engines or when required load exceeds one AE can handle, AE synchronized that's why critical.
Click to Zoom

 

18 July, 2021 The power cables are laid above the high temperatures exhaust pipes, then what happens will be as in photos, TMS 9. MS addressed the issue in this kind of condition at least 3-4 vessels and seem like the problem is still existing in many vessels, the problem is keep coming to MS to address the issue.

 

Click to Zoom

 

17 July, 2021 The vessel TMS 9 is urgent called to address the bow thruster propeller problem. MS is ready to serve as needed. The problem is about the bow thruster motor is leaking, then required to address the leaking problem in such an urgent time. We made it finally, meet all customer requirments.
Click to Zoom

 

4 July, 2021 Even on Sunday, another MS team is working on the Supply boat Fire Fighting pump (FiFi) alignment, SC Glory 6.
Click to Zoom

 

3 July, 2021 The 1st vessel is ready for bow thruster installation, UE.11.
Click to Zoom

 

30 June, 2021 Another our big master pieces has started, bow thruster installation and commissioning job for 6 vessels is going on. We proved that MS is second to none. The bow thruster installation for 5 vessel is starting from nothing to the completed system.
Click to Zoom

 

26 June, 2021 To service our clients in Ranong province this trip, we had great preparations for many things in advance e.g., spare parts, team COVID test and timing. Finally, we made it. Teamwork is the most important thing lead to achieve the goals
Click to Zoom

 

6 June, 2021 Urgent request: due to the vessel mast and navigation equipment damaged, MS spent 3 days to recover all back to normal condition — TMS 10. 
Click to Zoom

 

2 June, 2021 When there is incident or unwanted issue of power cables in the vessel, MS is a team to address the problems for ship owners & meet the class surveyor's requirements — TMS7. 
Click to Zoom

 

14 May, 2021 Buoys maintenance for PTTEP jetty is completed, delivered and installed back and to jetty today. All are back in good conditions. 
Click to Zoom

 

8 May, 2021 It's our pride for the alignment jobs which significantly proved and feel for the result of before and after. The engines are now running smoothly and stable — SC Glory 7. 
Click to Zoom

 

1 May, 2021 Another alignment jobs to address the vibrations issue on Fire Fighting pump (FiFi), job is completed with high satisfaction. 
Click to Zoom

 

29 April, 2021 Foam filled fenders are delivered to the jetty safely. Completed another mission among the COVID pandemic, import products in this situation is not real smooth . Good plan, great results. 
Click to Zoom

 

19 April, 2021 Watertight door system which is controlled by PLC (Programable Logic Control), which is very critical safety system, is repaired and replaced PLC modules. Back to work as per vessel requirements completely. 
Click to Zoom

 

Azimuth Control System is the propeller angle control system which comprise of Potentiometer's. After using for a while you might encounter which the problem. We already addressed the problem on SC Winter on Oct 15, 2019.
Click to Zoom

 

Swapping the main engine Cummins KTA38, disconnect then remove the existing engine and install brand new one completely settle on M.V. TMS 2 on Oct 23, 2019.
Click to Zoom

 

Vessel from abroad (M.V. Era Bedikari) which working in the gulf Thailand had FiFi pump problems i.e., coupling is broken, misalignment set up and etc. MS completely done this job which high performance outcome on Nov 10, 2019.
Click to Zoom

 

Vibration survey to find the causes of problem to prevent vessel downtime. Engine cost is about 10 million THB. Don't let small thing goes Big. Job in Surat Thani province was done on Nov 23, 2019.
Click to Zoom

 

KTA38 Cummins Maintenance jobs for TMS 12 on Nov 28, 2019 completed as planned.
Click to Zoom

 

Cummins KTTA19 generator overhaul job at Hatyai International airport is done completely and meet customer requirements on Dec 10, 2019.
Click to Zoom

 

Repair FRC engine for SC Winter on Feb 3-7, 2018
Click to Zoom


Gearbox Overhaul job;
 
  • SC Glory 3; there are 2 gearboxes are performed for overhaul job on Dec 18-24, 2018
  • SC Glory 2; there are 3 gearboxes are performed for overhaul job on Nov 27 – Dec 19, 2017
  • SC Brave; there are 3 gearboxes are performed for overhaul job on Jan 22- Feb 5, 2018
  • SC Glory 4; there are 4 gearboxes (includes FiFi pump gear) are performed for overhaul job on Feb 24 – Mar 5, 2018
Click to Zoom


Flow Meter Real Time Installation & Commissioning;
 
  • Jan 8-14, 2018;Install flow meters, cables laying, cables termination follow by the flow meter sea trial for the vessel Vos Ares
  • Jan 20-27, 2018;Install flow meters, cables laying, cables termination follow by the flow meter sea trial for the vessel Vos Alanta
  • Feb 12-17, 2018;Install flow meters, cables laying, cables termination follow by the flow meter sea trial for the vessel Vos Champion
Click to Zoom


Perform the Alignment Vibration Survey – Uniwise Express 22, Uniwise Offshore Company Limited. Job is completed on Oct 26, 2017
  •  
  • Remove the current the engine resilient to change the rubber element
  • Perform alignment for all main engines with dial gauge & laser alignment
  • Check vibration (in the port & sea trial) for all main engines
  • Submit full service report on Oct 26, 2017
Click to Zoom

 

Perform Fire Alarm Detection System – M.Energy, Offshore Charters Pte., Ltd. Job is completed on Nov 27, 2017
 
  • The general fault alarm has been issued for long time
  • It was chronic problem and difficult to address
  • Marine Services team onboard and fixed the issue, completed the job on Nov 27, 2017 with no issue
Click to Zoom

 

Perform the Alignment Vibration Survey – Uniwise Express 23, Uniwise Offshore Company Limited. Job is completed on Nov 30, 2017
 
  • UWO mechanic team swing out the engine
  • Marine Services team perform the alignment with laser
  • Vibration survey with vibration analyzer both in the port follow by sea trial
  • Job is completed on Nov 30, 2017 with high satisfactory feedback
Click to Zoom

 

Remove & Install gear box – TMS 8 & TMS 111 – Job is completed on Oct 9, 2017

 

We have the urgent mission to remove the gear box from TMS 8 and install on TMS 111

The job scope are:

  • Disconnect all the hoses & electric wires for 2 boats
  • Open the deck of 2 boats
  • Lift up the gear box from TMS 111 to onshore
  • Left up the gear box from TMS 8 to install on TMS 111
  • Reconnect all hoses & electric wires
  • Test the gear functions in the port
  • Perform sea trail with meet the expectations
Click to Zoom

 

SC Sky; Repair the engine control problem
 
SC Sky; Repair the engine control problem, engine could not increase speed more than 1,200 RPM, pitch % is blocked at 49% (when on load control) – job is completed on Sep 26, 2017.
Click to Zoom

 

Midlife (Top Overhaul) for all 3 main engines of TMS 5 (Top Maritime Service Company Ltd.) – Job is Completed on Sep 2, 2017.

 

The Midlife Overhaul scope of work is to carry out for the unit Cummins Engine model KTA38 – M2 for;

  • Remove, service/ rebuild and re-fit the following components:-
    • Cylinder head (reconditioned)
    • Fuel pump
    • Fuel injector
    • Turbocharger
    • After-cooler
    • Fresh Water Pump (inspection)
    • Sea Water Pump (inspection)
    • Thermostat Housing
  • Valve and Injectors overhead setting
  • Test engine (with free run and followed by sea trial)
  • The result is meet all the customer expectations.
Click to Zoom

 

PLC problems on Meo Monarch 1
 
PLC problems on Meo Monarch 1 which comprise of the master & slave station did not work as designed, the alarm cards error and water tight door, respectively.
Click to Zoom

 

Bow Thrusters Commissioning Project
 
Recently, we supplied, fitted and commissioned bow thrusters for UniExpress10 (Uniwise Offshore Company).
We also supplied not only the power & control wires but also the hydraulic systems as well.
Our experience and expertise enable us to provide you with an installation that will suit your boat and your budget. Full or part installations can be carried out according to owners' requirements.
Click to Zoom

 


Winch Installation & Commissioning Project
 
We installed & Commissioned for the Hydraulic Winch for Uniwise Supporter boat. We started from welding jobs, winches installation and hydraulic hose piping connections. Completed by commission the system to ensure all equipment work properly as design and requirement. All the test is past completely.
Click to Zoom